The Saudi Power Procurement Company (SPPC) has revealed the Qualified Developers for the sixth round of renewable energy projects under the National Renewable Energy Program (NREP), overseen by the Ministry of Energy.
The total capacity for these Round 6 projects is around 4,500 MW.
Qualified Bidders for Solar PV Projects
- Abu Dhabi Future Energy Company PJSC – Masdar, JERA NEX Limited
- Alfanar Company CJSC, Power Construction Corporation of China (POWERCHINA)
- EDF Renouvelables S.A., China Power Engineering Consulting Group International Engineering Co., Ltd.
- Kahrabel FZE (ENGIE S.A), POSCO INTERNATIONAL CORPORATION
- FAS ENERGY KSA LLC, Saudi Electricity Company
- Jinko Power (HK) Company Limited
- Korea Electric Power Corporation (KEPCO)
- Marubeni Corporation
- Nesma Renewable Energy
- SPIC Huanghe Hydropower Development Co., Ltd.
- Sumitomo Corporation
- TOTALENERGIES RENEWABLES SAS
- Al Jomaih Energy & Water Co. Ltd.
- Sembcorp Utilities Pte Ltd.
- Al Gihaz Holding Company
- Korea Western Power Co., Ltd.
Qualified Bidders for Wind PV Projects
- Abu Dhabi Future Energy Company – PJSC – Masdar, Al Jomaih Energy & Water Co. Ltd., Nesma Renewable Energy
- EDF Renouvelables S.A., Jinko Power (HK) Company Limited
- Kahrabel FZE (ENGIE S.A), Saudi Electricity Company
- Marubeni Corporation, China Power Engineering Consulting Group International Engineering Co., Ltd.
- Sembcorp Utilities Pte Ltd, POSCO INTERNATIONAL CORPORATION
- Sumitomo Corporation, Korea Electric Power Corporation (KEPCO)
- TOTALENERGIES RENEWABLES SAS, NAREVA HOLDING
- Marubeni Corporation, JERA NEX Limited
- Goldwind Science & Technology Co., Ltd.
- Power Construction Corporation of China (POWERCHINA)
- Alfanar Company CJSC
- SPIC Huanghe Hydropower Development Co., Ltd.
- Al Jomaih Energy & Water Co. Ltd.
- Sembcorp Utilities Pte Ltd.
- Al Gihaz Holding Company
- Korea Western Power Co., Ltd.
Project Details
- 1500 MWac Dawadmi Wind IPP in the Central province
- 1400 MWac Najran Solar IPP in the Southern province
- 600 MWac Samtah Solar PV IPP in the Central province
- 600 MWac Darab Solar PV IPP in the Southern province
- 400 MWac Sufun Solar PV IPP in the Central province
These initiatives are integral to the NREP’s goal of achieving an optimal energy mix, aiming to replace liquid fuels in Saudi Arabia’s power sector and provide 50% of electricity from renewable sources by 2030.